nVIDIA Shield Android Tablet HDMI Mini to HDMI TV 1.5m Long Wire Cord Lead Cable

$9.00

nVIDIA Tablet HDMI TV Cable

This high speed HDMI cable connects the nVIDIA Tablet to any TV with a HDMI port. Play movies, games & apps on your television.  

Cable length: 1.5m (4.92 feet)

SKU: NVA-HMIN-1.5M Category: Tags: , ,

Description

Compatibility

Please check that your nVIDIA Tablet model is below for this cable to work.

  • Shield Tablet;

Still not sure this cable will fit your Tablet? Please contact us with your Tablet make and model.

Cable Specifications  

  • Cable supports 480i, 480p, 720p, 1080i, 1080p, 2K & 4K resolutions;
  • Oxygen Free Copper Conductor, Copper Braid Shielding, EMI & RFI protection;
  •  Black Cable  24K Gold Plated Connectors ;
  • High Speed with Ethernet, 3D over HDMI & Audio Return;
  • 28AWG (wire thickness) which is suitable for cables up to 10m in length;
  • HDMI V1.4 (V1.3 Compatible), 320 Ghz & 10.2 Gbps data transfer;

Additional information

Brand

EAN

7429155721777

Manufacturer warranty

1 Year

Cable Length (metres)

MPN

NVA-HMIN-1.5M

Connector A

Connector(s) B

Connection Split/Duplication

None (1 : 1)

Cable Type

HDMI Cable

Reviews

There are no reviews yet.

Be the first to review “nVIDIA Shield Android Tablet HDMI Mini to HDMI TV 1.5m Long Wire Cord Lead Cable”

Your e-mail address will not be published. Required fields are marked *

Product enquiry