Sale!

Premium Braided iPhone 7 Plus, 6S, SE, iPad Pro & iPod USB Laptop PC Computer / Charger Lightning 3m Long Lead Wire Cord Cable – Red

£5.99 £3.44

  • Connects to your iPhone 7 / 7 / 6S / 6S / 6 / 6 / SE / 5S / 5C / 5 / iPads* & iPod**
  • Use to transfer data from your iPhone*** / iPad* / iPod** to your laptop
  • Plug into a mains adapter for rapid charging of your iPhone*** / iPad* / iPod**
  • Length: 3 metre(s)
Categories: , Tags: , ,

Description

This cables fits the iPhone 7 / 7 / 6S / 6S / 6 / 6 / SE / 5S / 5C / 5 / iPads* & iPods and other compatible devices.  The USB end connects to laptops for syncing data such as photos, music, videos etc…, or can be paired up with a USB socket plug to charge from the mains.

Specifications:

  • Premium Quality – ultra lightweight alloy moulds
  • Cable Specifications: 1M (24AWG / OD 2.8mm); 2M (22AWG / OD 3.5mm) /- 0.1mm
  • Connector 1: Male USB 2.0 (Type A) 4 Pin; Gold Plated Pins
  • Connector 2: Male 8 Pin Lightning Connector (Reversible); Gold Plated Pins
  • Conductor Material: Pure Copper
  • Jacket: Braided

Compatibility

***iPhones: iPhone 7 Plus, iPhone 7, iPhone 6s Plus, iPhone 6s, iPhone 6 Plus, iPhone 6, iPhone SE, iPhone 5S, iPhone 5C, iPhone 5

*iPads: iPad Pro 9.7, iPad Pro 12.9, iPad Air 2, iPad Air, iPad Mini 4, iPad Mini 3, iPad Mini 2, iPad Mini

**iPods: iPod Touch (6th Generation), iPod Touch (5th Generation), iPod Nano (7th Generation)

Additional information

Brand

Cable Length (metres)

Cable Type

USB Cable

Colour

Connection Split/Duplication

None (1 : 1)

For Device Brand

Manufacturer warranty

1 Year

MPN

USBC3MR

Connector A

Connector(s) B

Reviews

There are no reviews yet.

Be the first to review “Premium Braided iPhone 7 Plus, 6S, SE, iPad Pro & iPod USB Laptop PC Computer / Charger Lightning 3m Long Lead Wire Cord Cable – Red”

Your e-mail address will not be published. Required fields are marked *

Product enquiry